custom hdd vermeer collars Preparation and commissioning before construction
① The base of the directional drilling rig is tightly bolted on the machine, the base and each component must be installed smoothly and correctly, and the bolts of each part must ensure that the center of the vertical shaft (or turntable), the wheel rim of the crane and the center of the hole are in a straight line. (3) XU300-2 vertical shaft type hydraulic drill assembly sequence: mobile...